Friday, February 26, 2010

It’s here, it’s here! March 2nd - 5th. We are down to the last days before the start of the Xtreme Monarch House makeover … Check out the latest…


The Rumor!

The rumor that we have a “Hot Shot” crew coming in from Home Depot who will complete a remodel project in one day, while eating a sandwich and watching the kids at the same time is not true. The Home Depot volunteers are just like any of us, in fact they might be your neighbor. These are the clerks, the guy in plumbing or the gal in the paint department of you local Home Depot. They are stepping in to work side by side with us to see this project completed. It’s a great time to show our appreciation to the Home Depot. So we need your help any day that you are available.

Children: Because of the hazards, no children under 16years old will be allowed inside the fence of the construction area. They are welcome to help in the food prep area. If they are 16 & 17 years old, they must have a parent on –site.

We will be providing breakfast & lunch every day on-site! If you would like to donate or help contact Beth Hassman at scstarlet@yahoo.com .

Tuesday, March 2nd. (This day has just been added)
This is considered a “Home Depot “day for them to get familiar with the work, if you are available and would like to help you are more than welcome on-site.

Major Projects are:
• Supply deliveries and organization.
• Spray stucco painting exterior
• Spray primer-interior walls.
• Layout of the patio.
• Layout kitchen cabinets
• Form concrete sidewalk
• Layout fencing.

Wednesday, March 3rd.
Everyone is on-site, Home Depot and Crossroads.

• Finish paint to all the walls.
• Install kitchen fixtures.
• Lay engineered flooring
• Lay travertine
• Tile bathroom floor
• Bathroom cabinets
• Tile flooring in the back bathrooms
• New front door

The 4th & 5th will mainly be Crossroads finishing what we started. The exact list is as follows:

Security:
• Front & Rear security lights
• PVC fencing with man gate.
• Side gate
• new front door/locks
• Smoke detectors

Landscaping:
• Cap retaining wall
• Repair retaining wall with brick/rock façade or paint.
• Driveway bed: sprinklers, plants, 12” garden wall with back fill.
• Front of house: 2 trees,
• concrete walkway
• pots & plants, sod,
• sprinkler repair.

Exterior:
• Replace 13 windows, retro fit.
• Paint
• Patio rail.
• Freestanding patio structure
• Gutter repair
• R/R vent covers
• BBQ

Bathroom:
• Flooring: tile w/base boards
• Replace toilet
• Paint
• Lighting
• Vanity/sink/fixtures
• tile shower enclose.
• Interior door & hardware.

Kids Corner
• Flooring: tile or engineered wood.
• Baseboards
• Paint
• Lighting
• Ceiling fan

Great Room:
• Paint
• Flooring
• Lighting
• 2 ceiling fans
• Baseboards/crown molding.
• Wood façade

Kitchen:
• Paint
• Floors
• lighting
• Cabinets
• Counter tops: Tile
• Sink/Faucet/disposal
• Appliances: Stove, fridge, dishwasher, microwave

Multipurpose room (Separate structure)
• Flooring :Bamboo
• Paint
• Window treatments
• Light fixtures
• Tile bathroom floors.
• Replace sink and toilets

No comments:

Post a Comment